Engineering
Assistant Town Engineer: Anthony Citriniti
Phone (607) 648-4800 Ext.105
E-mail: engineer@townoffenton.com
Functions:
- Supports departments, residents, land owners, and businesses having any technical issues/concerns.
Highway Engineering:
- Drainage
- Special Projects
Mapping:
- Data Storage & Retrieval
Site Plan Review:
- Review for compliance with Regulations (NYS, County & Town)
- Submittal Date Schedule for Actions to be placed on Planning Board agenda
- Zoning Article 150-47 'Special Approval Procedure'
Town Facilities:
- Engineering Design, construction & maintenance
Storm water Pollution Protection Plan: (click to view)
- Public involvement & participation
- Illicit Discharge Detection & elimination
- Construction site storm water runoff control
- Post construction storm water management
- Pollution prevention for municipal operations
STORMWATER POLLUTION PREVENTION PLAN GUIDE
MS4 ANNUAL REPORT 2022
BROOME TIOGA STORMWATER COALITION'S MS4 ANNUAL REPORT 2021
Click to view complete guide or individual appendix (all info in PDF format )

Document Center
The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.
Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category
Documents sorted by SEQ in Ascending Order within category
APPENDICES: Charts and Forms9 documents
- Appendix A - SWPPP and Stormwater Permit Process Chart
- Appendix B - Notice of Intent (NOI) Application Form
- Appendix C - Notice of Termination (NOT) Application Form
- Appendix D - NYS Standards&Specifications for Erosion & Sediment Control
- Appendix E - Erosion and Sediment control plan for Small Home Site
- Appendix F - NYS Stormwater Design Manual
- Appendix G - Erosion & Sediment Control Plan Review Checklist
- Appendix H - Construction Site Log Book
- Appendix J - Construction Stormwater Inspection Manual